Squire and Partners | June 2011 to April 2021 | Associate Director
BA (Hons) Dip Arch ARB


one hoshang
status: submitted for tender

One Hoshang in Karachi is a new residential-led mixed use development that responds to increased international property demand in Pakistan. The brief sought to create a highly sustainable apartment building of international level design and living standards, with a selection of shared spaces to foster a community of residents.
Set on a corner site within the Clifton Karachi cantonment area, where Hoshang Road meets Abdullah Haroon Road, the design retains the façade of a colonial style heritage building to create the ground and first floors of a four storey podium. Two retail spaces at ground level activate the street frontage, and a museum to explain the history of the building with artefacts from the site is located on the first floor. The upper two levels are slightly set back and house staff accommodation, car parking and residents’ storage. Façades of the podium feature bespoke ‘mashrabiya’ screens at the second and third levels, and vertical fins on the fourth, allowing for continuous ventilation of the floors.
A new 34-storey tower rises from the podium, embellished with intricate patterned screens that take inspiration from Mughal and Sindh patterns. Vertical planting softens the transition between the podium and the tower. The fifth-floor roof of the podium and base of the tower houses residents’ amenities including a pool, spa, gym and events space. The tower offers 31 apartments, one per floor, with 3-bedroom residences on the lower levels and 4-bedroom residences on the upper levels. The top two floors connect to create a 5-bedroom duplex penthouse featuring a cut away façade which carves out terraces on each corner, and creates a crown structure to mark the top of the building.
​
my role
Associate Director + Project Leader
​
-
RIBA Stage 2: Finalising the brief with the client and developing the design with the project team.
​
-
RIBA Stage 3: Directing internal team of architects to complete the detailed design ready for submission to the delivery architect. First point of contact for client and local design team. Leading an international cross-disciplinary team of consultants.
​
-
RIBA Stage 4: Compliance monitor for all design information produced by the delivery architect.

project design features + technical challenges
-
Facade with with bespoke GRC mashrabiya screens.
​
-
Existing façade to to historic building to be retained.
​
-
Developing the design for a 34-storey tower in a seismic zone.
​
-
Complying with local planning regulations and building codes.
​
-
4-storey car parking podium with complex security and access requirements.
​
-
Design to achieve LEED gold standard.
​
-
Developing and co-ordinating the design with a team of UK-based and Pakistan-based consultants.

project team
UK Design Team
​
Architect: Squire & Partners
​
Interior Designer: 1508 London
​
Services Engineer: Atelier Ten
​​
Fire Consultant: Atelier Ten
Sustainability & LEED: Atelier Ten
Façade Consultant: AESG
​
Transport Consultant: Pell Frischmann
​
Cost Consultant: Gardiner & Theobald
​
Pakistan Design Team
Architect: Arcop Associates
​
Structural Engineer: Mushtaq and Bilal
​
Services Engineer: S. Mehboob and Company
