The original flagship Urban Golf opened in Soho in 2005.  In 2009 a new bar was added to accommodate the centres popularity, as well as to create a space for people to relax, drink and chat before or after their games.  

The design approach carries on the same aesthetic as the original space, with warm walnut panelling and exposed brickwork.  A bit of playfulness has been added by installing a recessed putting green on the ceiling.

Project Architect

 

  • RIBA Stage 4: Responsible for developing the final proposals with the client and co-ordinating the scheme with the design team.  Responsible for producing tender information.

  • RIBA Stage 5: First point of contact for both contractor and client.  Making decisions on site and developing alternative solutions with main contractor and specialist trade sub-contractors.   Day to day running of the project: chairing all meetings, issuing construction information, approving sub-contractor’s drawings and samples.

my role 